Search Results

282

Worker should have eye protection....

299

Two workers using small pneumatic hammers. No hearing protection, eye protection or respirators. It does not appear that engineering controls are bein...

309

Hazardous waste workers working on pipe flange inside small trench. Workers wearing Level C personal protective equipment, Tyvek suits, gloves, 1/2...

413

Concrete pour, several potential fall/trip hazards inside excavation. Poor housekeeping around the work site....

350

Using hot stick (dielectric)pole to move wires. He has on protective work clothing, gloves and sleeve...

362

Eye protection not being used....

6

Demonstrating SCBA to class....

36

Broken grounding prong....

54

Hazardous waste worker in level A personal protective equipment....

73

Part of trench unsupported. Some shoring not braced by screw jacks. Loose board above workers heads. Ladder not visible in photo....