Search Results

1180

1926.550 Mobile cranes mounted on barges cannot exceed manufacturers original capacity. A load rating chart shall be clearly legible and secured in a...

1165

Hand screeding requires workers to assume an awkward posture (bending) and use a significant amount of force to level freshly poured concrete. The for...

1168

No fall protection, no rebar caps. Plan the work, work the plan....

1169

Ladder height exceeds guard rail height....

1170

1926.502 Hole covers should be marked. and they should be capable of supporting the weight of people, equipment and or material that might be impose...

1172

Working in deep cement all day can be very stressful. Using good durable boots with a sturdy sole and insoles with shock absorbing material will help....

1173

Hand trowels create pressure points that create stress on the hand and wrist. Hand trowels can be modified to better fit your grip and reduce wrist be...

1174

Hand screeding to level out concrete creates a lot of stress on the wrist, hands and back. Try screeding with one foot in front of the other to reduce...

1156

Scaffold ends do not have guard rails...

1158

Cleanup activities. Worker is using a 1/2 face air purifying respirator with a particulate filter. Avoid dry sweeping whenever possible, dry sweeping...