Search Results

672

Worker mixing mortar may need respiratory protection. Scaffolding not fully planked. Scaffold also needs additional cross bracing....

644

Brick cutting, bad housekeeping too much debris in area. No GFCI on electrical cord, T-pole not secured....

620

Workers should seal check and visually inspect their respirators for defects and fit every time they use them. Respirators that no longer seal correct...

634

Inside lead containment area. Abrasive blasting hose with light attached, near intake for dust collection system....

635

Inside lead containment area before abrasive blasting....

640

Inside containment preparing for abrasive blasting, blaster dressed in blasting hood with bib and protective clothing. Make sure to eliminate any pote...

642

Abrasive blaster dressed in blasting hood with bib and protective clothing. Keep containment area free of potential trip hazards....

629

Level C protective clothing. 1/2 face APRs with 100 series combination OVA filters....

619

Respirator, silica exposure. Whenever possible, reduce exposure levels through the use of engineering controls such as water spray attachments or...

628

Hazardous waste, level C protective clothing. 1/2 face APR with 100 series filters....