A scaffold more than four times its minimum base dimension must be restrained by guys, ties, or braces to prevent it from tipping. [1926.451(c)(1)...
Worker installing base section of modular frame scaffold. Worker has laid out mud sills and installed base plates. Screw jacks can be used to level ba...
Scaffolding without guardrails, potentially overloaded. Unsafe walking working space on scaffold....
Suspended scaffold with parapet hooks and rope tiebacks. Poor housekeeping on the site, potential trip hazards, loose paper. Tiebacks must be secured...
Two point (Swing stage) scaffold-1/2 in drill hoist...
Badly supported scaffold, excavation beneath scaffolding not shored...
Scaffolding around capital building, fully planked....
Float used for welding, no fall protection. NO protection from welding slag....
Scaffolding, tube and coupling...
No toe boards or netting to protect workers below scaffold....