Search Results

589

Engineering control, using hydraulic scissors to dismantle structural steel...

534

Operating a robotic pneumatic hammer to remove concrete from a steel beam, while another worker sprays water to reduce silica dust levels. Everyon...

499

Adjust your respirator before entering the exposure area, if you need to readjust your respirator, move outside the area, readjust the respirator and...

500

Do not unnecessarily expose yourself to silica dust. Barrier boards installed to prevent rocks from flying outside of the area....

504

Uncapped rebar, potential impalement. Exposure to construction dust/silica....

503

Using robotic pneumatic hammer to break up concrete. Machine is not equipped with dust suppression equipment so operator and workers down wind are sti...

505

Excavator with pneumatic hammer breaking concrete. Operator exposed to silica dust by this operation. Equipment not outfitted with water or a vacuum a...

506

Operating rock crushing machine. Operator using hearing protection and a respirator. Equipment outfitted with water nozzles to reduce silica dust leve...

485

Trench box being moved by a backhoe to be placed in a trench to shield workers from trench collapse....

83

Bull dozer