Using thermic lance to cut steel beam. Worker is tied off to a secure anchor point above his head....
Workers on aerial lift building a containment for a lead abatement project. Containment can potentially increase worker exposure levels. Workers shoul...
Hazardous waste operation, drilling/core sampling. Workers fully suited, hard hat, gloves and full face supplied air respirator. Potential trip,...
The ladder is tied off at the top and worker has maintained three points of contact with the ladder....
Securing ladder...
Scaffold cross bracing missing. Scaffold set up on top of unsecured excavation. Scaffold legs/base should always be set up in a safe/secure area. No f...
Unsupported scaffold boards, scaffold access ladder too short. Blocks falling off scaffold, scaffold in rear may be overloaded....
Ladders not sufficiently supported at base. Ladder jacks are not supposed to exceed 20 feet,1926.452(k)....
Appropriate warning signs should be located around construction site. Electrical lines should be kept away from water....
No fall protection. Either eliminate the hazard, provide passive protection, fall restraint or fall arrest....