Search Results

557

Using thermic lance to cut steel beam. Worker is tied off to a secure anchor point above his head....

572

Workers on aerial lift building a containment for a lead abatement project. Containment can potentially increase worker exposure levels. Workers shoul...

306

Hazardous waste operation, drilling/core sampling. Workers fully suited, hard hat, gloves and full face supplied air respirator. Potential trip,...

462

The ladder is tied off at the top and worker has maintained three points of contact with the ladder....

470

Securing ladder...

226

Scaffold cross bracing missing. Scaffold set up on top of unsecured excavation. Scaffold legs/base should always be set up in a safe/secure area. No f...

225

Unsupported scaffold boards, scaffold access ladder too short. Blocks falling off scaffold, scaffold in rear may be overloaded....

224

Ladders not sufficiently supported at base. Ladder jacks are not supposed to exceed 20 feet,1926.452(k)....

784

Appropriate warning signs should be located around construction site. Electrical lines should be kept away from water....

826

No fall protection. Either eliminate the hazard, provide passive protection, fall restraint or fall arrest....