Job made ladder with platform and hand rails....
Supported scaffold with stairway,toe boards and guardrails, legs resting on mud sills....
Suspended scaffold with parapet hooks and rope tiebacks. Poor housekeeping on the site, potential trip hazards, loose paper. Tiebacks must be secured...
Installing rebar mat prior to pouring concrete....
Torch cutting. A fire extinguisher should be readily available in case of emergency. Positive means should be made to confine sparks and slag. A worke...
Installing wooden sheeting, no fall protection on open sides....
This images shows a man fitted in Level C protective clothing....
Concrete buggy, Poor housekeeping, work site should be kept clear of debris to prevent potential accidents. Workers and supervisors on site should use...
Hazardous waste workers conducting a cleanup after a hazardous waste spill. Workers are using class C protective clothing....
Electrical transmission tower...