Scaffolding with stairway, scaffold legs sitting on mud sills....
Overlap should be 12 -18 inches....
Scaffolding with warning sign, restricted area. Guard rails at scaffold ends...
Scaffolding around Capital building...
Scaffold without guardrails or toe boards. Potential overloading issue on scaffold....
Scaffolding...
Man climbing up scaffolding without a hard hat or work boots. Scaffolding does not have toeboards and mesh to protect workers below scaffold from fall...
Disassembling/assembling scaffold without fall protection. Incomplete planking in some areas, no toe boards....
Scaffolding, not fully planked. No protection from falling objects (toe boards or mesh)....
Two point (Swing stage) scaffold-1/2 in drill hoist...