Search Results

295

Installing scaffolding....

305

Hazardous waste cleanup. Hazardous waste cleanup workers inside excavation with level 3 personal protective equipment (suits, gloves and 1/2 face a...

394

The worker is using a real time gas monitor, he does not have a safety harness on. Monitoring for Oxygen, LEL/UEL levels and toxic gases should be con...

426

Blanking device at flange in pipeline. Solid circle of metal is inserted into flange when the pipeline needs to be blocked for downstream maintenance...

326

No mid-rails no toe boards. Unsecured material on scaffold, spray cans, buckets. No protection for falling material such as toe boards, mesh or nettin...

346

Electrical substation with high voltage warning signs and fencing....

365

Operating grinder with shield in place, worker has on eye protection, face shield and gloves....

18

Hazardous waste worker, operating real time gas monitor. Worker wearing level B personal protective equipment....

33

Job built ladder with landings....

51

Worker using, non rollup type earplugs, hardhat and eye protection with side shields. General recommendation is to hold the outer ear up and out while...