Search Results

799

Front end loader close to edge of excavation. Trip/slip hazard for worker steping over plastic pipe....

801

Worker not inside trench while back hoe in use....

806

Air tank should be moved away from trench. Operator not using seat belt....

784

Appropriate warning signs should be located around construction site. Electrical lines should be kept away from water....

781

Excavations should be protected by barricades and warning signs. Before digging you must locate all underground utilities. Every state has a call-befo...

782

Workers should not be in the way of machinery if they are not required for the operation. Always maintain safe working distance from operating machine...

783

Any workers/supervisors/foreman not required for the operation should not be standing inside the trench. Operator must be aware of the location of all...

652

Spoils pile should be moved back from the edge of the trench....

535

Four employees clearing rocks from the work site, three of them are using rock drills, one is operating a hydraulic rock splitter. All of them are usi...

548

Four workers clearing rocks from work site. Three workers using rock drills the other worker is using a hydraulic rock splitter. All of the workers ar...