| Presented
at the Construction Safety Council's 13th Annual Construction Safety
& Health Conference & Exposition, Rosemont, Illinois, February
2003. |
Table of Contents
- Who is Covered
- Definitions
- Site Preparation
- Cranes
- §1926.753 Hoisting and Rigging
- Structural Stability
- §1926.754 Structural Steel Assembly
- §1926.755 Column Anchorage
- §1926.756 Beams and Columns
- §1926.757 Open Web Steel Joists
- Metal Buildings
- §1926.758 Systems-engineered Metal Buildings
- (Non-Hoist) Overhead Hazards
- §1926.759 Falling Object Protection
- Fall Protection
- §1926.760 Fall Protection (for connectors, deckers, and
all others)
- Training
- §1926.761 Training (general and specialized)
- The standard covers all employers engaged in steel erection activities.
- There are two lists of activities:
- Primary: All activities in .750 (b)(1) are covered (connecting,
bracing, guying . . .)
- Ancillary: All listed in .750 (b)(2) are covered "when they
occur during and are a part of steel erection activities"
(sealing, caulking, elevator beams . . .)
Does not include:
- electrical transmission towers,
- communication and broadcast towers,
- tanks.
1926.752 (c)
- Adequate layout area
- Adequate access roads
Layout area and access
roads
Cranes and Falling
Object Protection
§1926.753 Hoisting and
Rigging
- Cranes: 1926.550 applies (except personnel platform provision)
PLUS new, additional requirements
- Employee exposure to overhead loads to be reduced through preplanning
(.752) and work practice requirements.
- Allows for expanded use of personnel platforms (.753 (c)(4)).
- Prescribes proper procedure for multiple lifts "Christmas-treeing"
(.753(e) "multiple lift rigging procedure")
Multiple Lift

§1926.759 Falling Object
Protection (does not apply to materials being hoisted)
- Secure loose items aloft
- Controlling contractor to bar operations below steel erection unless
falling object protection provided (from objects other than hoisted
materials)
§1926.755 Column Anchorage
- Requires 4 anchor bolts per column
- contains design strength requirements and other column stability
requirements
- Assure the adequacy of anchor bolts modified in the field
- written notice must be given to erector that changes were made
§1926.752(a) and (b)
Concrete Strength
- Concrete/mortar
for footings, piers & walls
- Written confirmation
of ASTM test -- to erector
§1926.756 Beams and Columns
- Two bolts per
connection prior to releasing hoisting line
- Safe procedures/devices
for making double connections at columns
Minimum of two bolts per connection
before releasing hoisting line
Double connection with seat
§1926.757 Open Web Steel Joists
Steel joist concepts: terms

- Erection bridging "anchored" to a "terminus point":
- What you have
to do before releasing hoisting cable:
- Joist end
connection requirements
- Erection
bridging
- Max # of workers
allowed on joist
- Specs for:
- Initial
connections (specs and devices; holes requirement)
- Final connections
- Requirements
vary with length of span
- Some exceptions
for "constructibility"
- Requirements
for landing and placing loads on joists
- Some requirements
may be modified through a site-specific erection plan (tandem setting
of some 60'+ joists and requirements for landing decking bundles)
§1926.754 Structural Steel Assembly
- Provides
specific work practices for:
- maintaining
structural stability (max# unsecured floors)
- landing
deck bundles - where and weight
Metal Decking
Decking Bundle
§1926.758 Systems-Engineered Metal Buildings
Requirements for the erection of these specialized structures
which account for a large amount of steel erection.

§1926.760 Fall Protection
- All must be
protected at heights greater than 2 stories or 30 feet, including
connectors and deckers
- Between 15
and 30 feet: Fall protection required for all with exceptions for:
- Deckers
in controlled decking zone (CDZ) and
- Connectors
- Connectors
must be provided and wear equipment necessary to be able to
be
tied-off, or be provided with other means of fall protection
§1926.760 Fall Protection (cont.)
- Controlled
decking zone:
- For leading
edge decking work
- limited
access
- designated
boundaries (usually by control lines)
- Work
practices for attaching deck:
-
install safety attachments from leading edge back
-
no final attachments allowed in CDZ
-
up to 3000 SF of unsecured decking
- specific
training requirements
Fall Protection -- Perimeter
Cables (req. in beams and columns)
- Requirements
to facilitate quick installation of perimeter safety cables:
- Column attachments
or holes in columns for perimeter safety cables
- Column
splice height and strength specified
- Perimeter cables
required on multistory buildings
- Must be
installed "as soon as the metal decking has been installed"
- Custody of Fall
Protection Equipment:
- Controlling
contractor must choose to either:
- accept
responsibility for maintaining fall protection equipment left
by erector,
- OR
ensure that it is removed (.760(e))
1926.754(e) holes and openings
minimizing fall hazards in interior openings (decking-over)
- Walking/working
surfaces requirements:
- tripping
hazards: shear connectors (and similar projections) generally
prohibited until decking is installed
- slip resistance
criteria for painted structural steel members (effective 5 years
after the rest of the standard)
Shear Connectors
§1926.761 Training
- Qualified person
to train workers in use & operation of fall protection equipment
- Qualified person
to train workers engaged in specific activities:
- "Christmas-treeing"
- connecting
- CDZ procedures
SITE SPECIFIC ERECTION PLAN
OPTION §1926.752
- No general
requirement for an erection plan
- Some requirements
may be modified through a site-specific plan if equivalent protection
is provided.
- Safety
latches on hooks activated (.753(c)(5))
- Setting
joists 60'+ at/near columns in tandem (.757(a)(4))
- Landing
decking on steel joists (.757(e)(4))
§1926.750(c) Specific Controlling
Contractor Duties
- Written notification
to the steel erector:
- Concrete
in piers/walls is cured re ASTM spec
- Anchor
bolt modifications/repairs approved by project engineer (.752(a);
.755(b))
- Adequate on-site
access roads (.752(c))
- Preclude work
below steel erection unless there is overhead protection (.759(b))
- Choose whether
to accept responsibility for maintaining fall protection equipment
left by erector (otherwise it must be removed) (.760(e))
Effective Date and Phase-In
- New Effective
date: January 18, 2002
- Phase-in Exceptions
for
- Component
provisions (these affect the design of components. Example: columns
must have 4 anchor bolts)
- Component
provisions will NOT apply where:
- (Buildings)
- Building
Permit obtained prior to January 18, 2001
- Steel
erection has begun on or before September 16, 2001
- (Bridges)
-
Contract date before January 18, 2001; or
-
Steel erection began before September 16, 2001.
- Painted surfaces
slip resistance provision - July 18, 2006
OSHA's Web Site
- The complete standard
can be obtained from our web site at www.osha.gov.
Prepared by the U.S. Department
of Labor, Directorate of Construction
and Compliance Assistance
This paper appears in the eLCOSH website with the permission of the author
and/or copyright holder and may not be reproduced without their consent. eLCOSH is an
information clearinghouse. eLCOSH and its sponsors are not responsible for the accuracy of
information provided on this web site, nor for its use or misuse.
|