This is the second in a series of bulletins intended to promote good scaffold
practices in the masonry industry. The series deals with arch-frame scaffolds
and this issue looks at frames and braces.
Before erecting scaffolds,
make sure frames are not bent or missing any of their components. Broken
or bent frames should be tagged and taken out of service.
Installation
Align frames along
the wall leaving sufficient clearance for side brackets. A space of 2
to 4 inches will allow excess mortar to fall freely without splattering
the wall, yet not allow a worker's foot o become jammed. Vertical bracing
is necessary on both sides of every frame. Use a hand level to endure
frames are plumb. Minor adjustments should be made by adjusting leveling
screws.
Horizontal Bracing
The use of horizontal bracing on the first tier helps to square the scaffold
before nailing base plates to the mudsills. Horizontal brace s should
be installed on the first level and on every second level thereafter.
When placing horizontal
bracing on the first level it is good practice to install the bracing
near the top of the first frames. This will not impeded distribution of
materials to masons or present a tripping hazard to laborers.
It is good practice
to install horizontal bracing at the same level as tie-ins to the structure.
This topic will be dealt with in a later edition of this bulletin.
Connections
Insert pins are
good to connect frames vertically. It is good practice to have the insert
pin permanently installed in the top of each gram. When the nest frame
is places over the pin, a pigtail or other connecting device is used to
connect this frame to the pin. Securing devices are very important. as
they eliminate the possibility of uplift or separation.
Coupling devices are often omitted in the belief that the load on the
scaffold will keep the sections together. In fact, uplift can occur due
to swaying or uneven loading, causing the scaffold to pull apart if not
connected positively.
Positive Connection Using 2 pigtails
| Section 128(1)(e)
of the construction regulations requires a positive connection between
frames in both tension and compression. |
This connection can easily fall apart if there is any sway
| Scaffold
components from different manufacturers may not fit together properly.
Do not force or alter components to fit. Check with manufacturer before
using replacement parts. |
Vertical Bracing
Each level of the scaffold should be fully braced in the vertical direction
(cross brace) before proceeding to the next level. If the scaffold has
been laid out level and square, the braces should fit easily. Do not force
braces to fit easily.
Cross braces are
equipped with either notches or holes t the ends. The braces with notched
ends can only be used with J-Lock connectors.
Braces with holes
at the ends can be used with any of the standard locking devices.
Ensure all connectors
are maintained in good condition.
| Never climb
up or down the braces. This creates a dangerous fall hazard and may
damage the braces. Section 70 of the Construction Regulations requires
that a ladder be used to access a scaffold at all times. Always ensure
ladders are tied off. |
All parts, fitting,
and accessories must be installed in accordance with the manufactures'
instructions.
Failure to install
all components can significantly reduce safety factors and stability.
| Section 128(1)
of the Construction Regulations require that each scaffold frame be
braces in the vertical and horizontal direction to prevent lateral
movement. |

Braces should be on both sides of each scaffold piece
except for the end frame.
Never used bent frames

Do not use braces to climb up and down scaffold. Use a ladder.
Refresher Quiz
(True or False) answers found below
| 1)
One brace per scaffold frame is sufficient. |
True_____ |
False_____ |
| 2)
Scaffold frames must be pinned together to prevent uplift. |
True_____ |
False_____ |
| 3)
Bent frames should only be used at the end of a scaffold run. |
True_____ |
False_____ |

For
more information or training, contact
©
Construction Safety Association of Ontario
21 Voyager Court South, Etobicoke, Ontario M9W 5M7
Tel: 416-674-2726Fax: 416-674-88661-800-781-2726
info@csao.org
This paper appears in the eLCOSH website with the permission of the author
and/or copyright holder and may not be reproduced without their consent. eLCOSH is an
information clearinghouse. eLCOSH and its sponsors are not responsible for the accuracy of
information provided on this web site, nor for its use or misuse.
|